The final deliverables of the project include:
* A fully operational water degasser capable of processes large volumes of water.
* The degasser will have a more
effective and controlled feedback loop system (including fail safes to turn
off the vacuum and water pumps when the water level goes too high or too low)).
* The machine will be easier to maintain.
o Users can completely evacuate the water with a manual drainage valve.
o A funnel-shaped plate at the bottom of the lower compartment promotes water removal.
o The water filter will remove any particulate from the water after it leaves the degasser and will be positioned in a location convenient for regular replacement.
* One quick reference operation card and a full-length operation manual
|
_________________ Background |
_________________ Design Overview |
_________________ Deliverables |
_________________ Evaluation |