The final deliverables of the project include:

*    A fully operational water degasser capable of processes large volumes of water. 

*    The degasser will have a more effective and controlled feedback loop system (including fail safes to turn
     off the vacuum and water pumps when the water level goes too high or too low)). 

*    The machine will be easier to maintain. 

o      Users can completely evacuate the water with a manual drainage valve. 

o       A funnel-shaped plate  at the bottom of the lower compartment promotes water removal.

o       The water filter will remove any particulate from the water after it leaves the degasser and will be positioned in a location convenient for regular replacement.

*    One quick reference operation card and a full-length operation manual

 

 

_________________
Home

_________________
Background
_________________
Design Overview
_________________
Deliverables
_________________
Evaluation
_________________
Budget
_________________
Timeline
___________________
Acknowledgements