Gantt Chart
|
|
2/13-2/17 |
2/20-2/24 |
2/27- 3/3 |
3/13-3/17 |
3/20-3/24 |
3/27-3/31 |
4/3- 4/7 |
4/10-4/14 |
4/17-4/21 |
4/24-4/28 |
|
Task |
Week 6 |
Week 7 |
Week 8 |
Week 9 |
Week 10 |
Week 11 |
Week 12 |
Week 13 |
Week 14 |
Week 15 |
|
Purchase Parts |
|
|
|
|
|
|
|
|
|
|
|
Construction |
|
|
|
|
|
|
|
|
|
|
|
Product Testing |
|
|
|
|
|
|
|
|
|
|
|
Redesign |
|
|
|
|
|
|
|
|
|
|
|
Final Report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Previous Timeline |
|
|
|
Updated Timeline |
|
|
|
Key Milestones
* The degasser consistently passes post-production evaluation.
o The dissolved oxygen concentration in 60 gallons of water is reduced less than 2 ppm within 30 minutes.
o The volume of water is retained throughout operation.
o Sensors work properly to deactivate the water and vacuum pumps if necessary.
* The water degasser can be easily transported within the building.
o Wheels permit movement, however brakes prevent drifting.
* An outside audience (operators uninvolved in production) determines the device's ease of operation.
* The operator’s manual is easily understood.
|
_________________ Background |
_________________ Design Overview |
_________________ Deliverables |
_________________ Evaluation |
|
_________________ Budget |
_________________ Timeline |
___________________ Acknowledgements |