Gantt Chart

 

2/13-2/17

2/20-2/24

2/27-     3/3

3/13-3/17

3/20-3/24

3/27-3/31

4/3-    4/7

4/10-4/14

4/17-4/21

4/24-4/28

Task

Week 6

Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Purchase Parts

 

 

 

 

 

 

 

 

 

 

Construction

 

 

 

 

 

 

 

 

 

 

Product Testing

 

 

 

 

 

 

 

 

 

 

Redesign

 

 

 

 

 

 

 

 

 

 

Final Report

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Previous Timeline

 

 

 

Updated Timeline

 

 

 

 

Key Milestones

*    The degasser consistently passes post-production evaluation.

o       The dissolved oxygen concentration in 60 gallons of water is reduced less than 2 ppm within 30 minutes.

o       The volume of water is retained throughout operation. 

o       Sensors work properly to deactivate the water and vacuum pumps if necessary.

*    The water degasser can be easily transported within the building.

o       Wheels permit movement, however brakes prevent drifting.

*    An outside audience (operators uninvolved in production) determines the device's ease of operation.

*    The operator’s manual is easily understood.

 

 

_________________
Home

_________________
Background
_________________
Design Overview
_________________
Deliverables
_________________
Evaluation
_________________
Budget
_________________
Timeline
___________________
Acknowledgements